AC wave balance control – allows adjustment from maximum cleaning to maximum penetration. ARC force control – fine tunes arc for stick welding from soft to high penetration, digging arc. Direct connections for TIG torch and quick lock output cable – for maximum convenience. Adjustable pre flow and post flow gas control – protects weld area and extends tungsten life. Six-foot gas hose and water inlet and outlet fittings are factory installed. Protected against overheating and over current. Digital amp/volt meter kit.

  • Drum and belt/brush head types standard
  • 7, 8 & 11″ diameter drums
  • 8 & 11″ diameter brushes
  • Dial Indicators on drums (cam adjustable)
  • 75″ belt length
  • Disc brakes on main motor
  • Double Infeed & outfeed holddown rolls
  • 15-65 FPM feed speed A/C (reversing)
  • Auto set
  • Air knife dryer
  • Conveyor belt tracking
  • Coolant/filter system integrated
  • Stainless steel construction where needed
  • 0-8″ opening (38″ constant passline)
  • 27″ infeed loading area
  • Quick release outboard support
  • Through-beam abrasive belt tracking
  • 11″ minimum part length.
  • Options:
  • Brush exchange unit
  • 230/208 voltage transformer
  • .250″ Copper

Testimonials

I’ve only had a chance to open and review the one fully assembled chassis as of yet but I have commend and express my appreciation for the level of quality of the finished product. The Anodizing, Artwork, Powder Coating and Laser Cutting is absolutely immaculate and looks incredible. This is a huge reflection of our companies mission for quality professional products.  […] fantastic job and thank you for providing this level of quality. We’re looking forward to more orders coming shortly.”
D. N.

Thanks again to you and your team for helping us out all last week with our rush parts. You were able to deliver excellent quality parts in an incredibly short time!”
L.R

We had a critical rush job. With Metalcraft’s help we were able to ship on time. We could have not done this without the help of you guys. We appreciate our partnership.”
H.H

Read More

Compatibility

CGP
Solid Works
CWB
RoHS
LeanKanban
Green Earth